Gas Main Installation Project Completed in Western New York

 Lockport, NY

We recently completed a challenging gas main installation project for one of the primary utility companies in Western New York. This job required careful planning, experienced crews, and the right equipment to safely complete work in complex conditions.

Our gas crews used our AT-40 horizontal directional drill to replace an 8-inch gas main, including a 300-foot creek crossing. We also installed 175 feet of 4-inch gas main beneath a busy four-lane roadway, coordinating multiple lane closures to keep traffic moving while maintaining safety on site.

To complete the scope, we installed an additional 250 feet of 2-inch gas main. All work was completed using our state-of-the-art horizontal directional drilling equipment and the decades of combined experience our team brings to natural gas distribution and HDD work.

This job was delivered safely, on time, and on budget - something we take pride in for every utility partner we work with.

  • slide
  • slide
  • slide
  • slide

Deep culvert replacements

Boston, NY

Approximately 50 new sections were installed at the four locations.

  • slide
  • slide
  • slide
  • slide
  • slide
  • slide

Underground Telecom Plant Move

Niagara Falls, NY

We were required to excavate and shift our customer’s underground plant 400 ft. from its existing location to accommodate for a road expansion. The underground plant consisted of two live fiber optic cables along with four live copper service cables up to 1800 pair. Our crews were required to coordinate with not only our telecommunications customer, but with a variety of other underground utilities and the contractor responsible for the road expansion.